Time for tea!

04.10.17 01:00 PM By Data Structures

14.09.2017: Another job done and time to head to the ferry port. Here DSI carried out a full bolt swap out and maintenance of an 80m Met Tower at Dersalloch Windfarm, Scotland.


Experts in Elevated Engineeringsince 1998.

Data Structures