27.02.2020: Data Structures crew putting the finishing touches to a new 80m SLX4/W MetMast system.
This one has been designed and installed with upgraded foundations and anchors for ease of increasing the height to 100m in the future (subject to permits, etc).
Data Structures –Experts in Elevated Engineering.
